CURRENT METHOD OF HOLE PRODUCTION 

Based upon the estimated time to manually layout and drill a hole
Enter the appropriate numbers in the text boxes and press the "calculate" button to determine the labor benefits of using the Ficep Excalibur 12 vs. current methods of hole production.
HOW LONG WOULD MANUAL LAYOUT TAKE?
Manual Layout Time (Seconds) Required to Manually Layout One Hole
Manual Drilling Time (Seconds) Required to Manually Drill One Hole Including Drill Positioning, Etc.
Total Time Per Hole Presently (Seconds)
0
TOTAL MANUAL HOLES PRODUCED PER HOUR 0
HOW LONG WOULD THE FICEP Excalibur 12 TAKE?
Average Time Per Hole Including Layout, Drilling & Positioning 30 Sec
AVERAGE NUMBER OF HOLES PER HOUR 120
THE NUMBER OF WORKERS REQUIRED TO MATCH THE Excalibur 12 BASED UPON MY CURRENT PRODUCTION NEEDS 0